Our Case Studies
We have successfully completed numerous projects for an expanding portfolio of clients. Discover some of the projects we've contributed to across the country.
Motability, Coalville
Date of Works: November - December 2024
Project Location: Leicestershire
Scope of Works
-
External Chlorination & Pressure Test in accordance with BS8558 to 100mtr x 90mm HDPE, 200mtr x 63mm MDPE, 100mtr x 32mm MDPE & 25mtr x 25mm.
-
Internal Chlorination in accordance with BS8558 to 2no, 3000ltr Cold Water Storage Tanks and associated outlets 100+.
-
Sampling inline with HSG274 and BS8558 requirements.
-
BSRIA BG29/21 pre commission clean to 1.no Primary ASHP loop.
-
BSRIA BG29/21 pre commission clean to 1.no PHX and 1.no DHWS.
Through close collaboration with the principal contractor, we were able to successfully deliver the project within the tight deadline, meeting all key milestones along the way. Despite the pressure of a compressed timeline, we demonstrated flexibility and adaptability, quickly accommodating last-minute changes to the schedule without compromising on quality or safety. Our team ensured that all commissioning works were witnessed on-site, and the water analysis results from all aspects of the project returned in line with the specified requirements, further confirming the quality and accuracy of our work.
As a result of our commitment to delivering exceptional service, the client was extremely satisfied with the outcome. We are proud to have not only met their expectations but also earned their trust, securing another repeat customer for future projects.

ProCook, Merryhill
Date of Works: October 2023
Project Location: West Midlands
Scope of Works
-
Internal Chlorination in accordance with BS8558 to domestic hot and cold water services.
-
Sampling inline with HSG274 and BS8558 requirements.
The project was completed within a tight handover schedule, but with careful planning and execution, it was a smooth and successful process. Our team of engineers promptly arrived on-site and carried out a thorough clean and chlorination of both the hot and cold water services in the domestic water system, ensuring full compliance with the job specifications.
Throughout the project, our engineers demonstrated a high level of expertise and efficiency, completing the work without any issues or delays. Every aspect of the task was meticulously carried out, and upon completion, all required documentation, including certification and detailed job analysis results, were promptly handed over to the client.
This particular client is a regular partner of HTS, with whom we have built a strong and dependable relationship over the years. We have consistently supported their Mechanical and Electrical (M&E) services, and our continued collaboration reflects the trust and mutual respect that has developed between us. We look forward to further opportunities to assist them and ensure the ongoing success of their projects.

Holland & Barratt, Newcastle
Date of Works: October 2024
Project Location: Eldon Square, Newcastle
Scope of Works
-
Internal Chlorination in accordance with BS8558 to domestic hot and cold water services.
-
Sampling inline with HSG274 and BS8558 requirements.
Our engineers arrived on-site and efficiently completed the clean and chlorination of the domestic water system, covering both the hot and cold water services as per the job specifications. The project was executed with precision, ensuring all tasks were carried out smoothly and without any issues.
Once the work was finished, all necessary documentation, including certification and detailed job analysis results, were handed over to the client. This not only marked the successful completion of the project but also demonstrated our commitment to high-quality service and thoroughness in every aspect of our work.
This client has been a regular partner of HTS, and over time, we have built a solid, trusted relationship. We continue to provide ongoing support for their Mechanical and Electrical (M&E) services, reinforcing our strong foundation and ensuring their projects run smoothly. The successful completion of this job further strengthens our continued collaboration with them for future work.

Salford City Academy
Date of Works: August 2024
Project Location: Manchester
Scope of Works
-
Internal Chlorination in accordance with BS8558 to domestic hot and cold water services.
-
Commissioning Services in accordance with CIBSE / BSRIA.
-
Sampling inline with HSG274 and BS8558 requirements.
Our fully DBS-cleared engineers arrived on-site and efficiently completed the commissioning of both the domestic hot and cold water services. In addition, they carried out a thorough clean and chlorination of the entire domestic water system, ensuring full compliance with the job specifications. The project was executed flawlessly, with no issues arising, showcasing our team's professionalism and reliability throughout the process. Upon completion of the work, all required documentation, including certifications and detailed job analysis results, were promptly handed over to the client on the same day, in preparation for the official handover the following day. This seamless process not only marked the successful conclusion of the project but also highlighted our commitment to delivering high-quality service and attention to detail in every aspect of our work.
As a new client for HTS, we are pleased to have exceeded expectations and secured a long-term relationship, demonstrating our dedication to delivering exceptional results and establishing trust for future collaborations.